Safe Deployments
This page covers the practices and checklists for safely deploying database schema changes, queued jobs with signing, and rolling back when things go wrong.
Pre-Deployment Checklist
Configuration & Secrets
- [ ] All required environment variables are set (run
hkm install --check) - [ ] Database credentials are in a secrets manager, not the codebase
- [ ]
APP_KEYis set and consistent across all servers (used by CSRF layer and signatures) - [ ] TLS certificates are valid and not expiring soon
Database
- [ ] Recent, tested backup exists and is restorable
- [ ] Backup is stored in a secure, offsite location
- [ ] Backup retention policy is defined (e.g., keep 30 days)
- [ ] All migrations have been tested on a staging database identical to production
- [ ] Destructive migrations (drops, renames) are in a separate deployment window
- [ ] Migration SQL has been reviewed by at least one team member
Code & Infrastructure
- [ ] All tests pass locally and in CI (
phpunit, type checking) - [ ] Branch has been reviewed via pull request
- [ ] Application has been tested on staging with production-like data volume
- [ ] Rollback plan is documented and tested
- [ ] Deployment runbook is up to date
- [ ] On-call team is notified of the upcoming deployment
- [ ] Monitoring dashboards are set up (see Production)
Performance
- [ ] Performance impact of schema changes has been estimated
- [ ] Any new indexes are in place before heavy queries run
- [ ] Queries that may cause lock contention have been identified
- [ ] Deployment window is scheduled during low-traffic periods if needed
Schema Migrations
Testing Migrations
Always preview SQL before applying:
# Staging database
APP_ENV=production DATABASE_HOST=staging.internal \
hkm cli migrate:run --pretend
# Review the output carefullyThen apply on staging and verify the application works:
# Apply
hkm cli migrate:run
# Test the application
curl -s https://staging.internal/api/health | jq
# Monitor for errors
tail -f var/logs/app.logExpand-Contract Pattern for Destructive Changes
When removing a column or table that the application code still references, use the expand-contract pattern:
- Expand — Add the new schema (new column, new table) while the old code still uses the old structure
- Deploy — Ship code that reads from the new location and writes to both old and new
- Contract — In a future deployment, remove the old column/table
Example: renaming users.name to users.full_name:
Migration 1 (Expand):
// In migration
$table->addColumn('full_name', 'VARCHAR(255)');Code Update (Deploy):
// Read the new column, write to both
public function update(User $user): void
{
$this->db->execute(
'UPDATE users SET full_name = ?, name = ? WHERE id = ?',
[$user->fullName, $user->fullName, $user->id]
);
}Migration 2 (Contract):
// In a future deployment
$table->dropColumn('name');Handling Large Tables
For tables with millions of rows, avoid long-running ALTER TABLE statements:
- Create a new table with the desired schema
- Copy rows in batches with a background job
- Redirect the application to use the new table
- Drop the old table after verification
// Migration: create the new table (raw SQL through the schema builder; MySQL syntax shown)
public function up(SchemaBuilderInterface $schema): void
{
$schema->raw('CREATE TABLE users_new LIKE users');
}
// Background job: copy in keyset-paginated batches through DatabasePort
$lastId = 0;
do {
$rows = $this->db->query(
'SELECT * FROM users WHERE id > :last ORDER BY id LIMIT 1000',
['last' => $lastId],
);
foreach ($rows as $row) {
$this->db->upsert('users_new', $row, conflictColumns: ['id']); // idempotent on retry
$lastId = (int) $row['id'];
}
usleep(200_000); // ease lock contention
} while ($rows !== []);
// Final migration: swap
public function up(SchemaBuilderInterface $schema): void
{
$schema->raw('RENAME TABLE users TO users_old, users_new TO users');
}Staging Destructive Migrations Separately
A single pending DROP statement blocks the entire batch. Isolate destructive changes in their own migration file:
# Create a new migration
hkm cli make:migration drop_unused_column
# Mark it as destructive (in your deploy docs)
# Run separately from expansions
hkm cli migrate:run --file=drop_unused_columnJob Queue Signing & Rollout
The job queue is an input channel. Anyone who can write to it is calling into your application. Signing jobs prevents tampering.
Enabling Signatures (Producer-First)
Job signatures are off by default because enabling them is a two-sided deployment:
- Producer must sign before putting jobs in the queue
- Worker must verify signatures when dequeuing
If the producer has not updated yet, the worker rejects every unsigned job as invalid.
Rollout sequence:
Deploy producer first (with signature generation)
- Producer stamps jobs with HMAC:
jobId | jobClass | queue | data - Workers still accept unsigned jobs (verification is not yet enabled)
- Producer stamps jobs with HMAC:
Verify producer is working
- Spot-check a few jobs in the queue — they should have a signature
Deploy worker (with signature verification)
- Worker validates every dequeued job's signature
- Unsigned jobs are rejected and dead-lettered
Set JOB_SIGNING_SECRET in .env after the producer deployment:
export JOB_SIGNING_SECRET=$(openssl rand -hex 32)If verification is enabled before the producer is ready, jobs back up in the queue as invalid and must be flushed.
Cache & Manifest Invalidation
PHP-FPM (BOOT_CACHE)
After deployment, clear the manifest cache so the next request recompiles:
# After git push, before restarting services
rm -rf var/cache/manifests/Why: BOOT_CACHE skips recompilation when module.json and config files are unchanged. If you deploy new code without clearing the cache, old manifests may remain in memory.
Application Cache
If you're caching data (queries, API responses), decide whether to clear it:
// In your deploy script
if ($this->cache instanceof CachePort) {
$this->cache->flush(); // aggressive: clears everything
// or
$this->cache->deletePattern('query:*'); // targeted
}Most applications can survive stale cache for a few minutes. Use targeted invalidation to minimize disruption.
Rollback Strategy
When to Rollback
Rollback immediately if you see:
- Error rate spikes above 1% (anything over baseline + 0.5%)
- Response latency jumps by more than 100ms at p95
- Database connections hang (connection pool exhaustion)
- Authentication failures for all users (auth bug, signing issue)
- Cascading failures in dependent services
Give real bugs 5 minutes to surface. Transient glitches resolve themselves; bugs don't.
Rollback Execution
Code Rollback
Revert the commit:
bashgit revert HEAD git push origin mainClear the cache:
bashrm -rf var/cache/manifests/Restart the application:
bash# PHP-FPM systemctl reload php8.4-fpm # OpenSwoole systemctl restart appVerify:
bashcurl https://example.com/health # Should return 200 OK
Database Rollback
If you just deployed migrations:
Restore from the pre-deployment backup:
bashmysql example_db < backup-2025-01-15-02-00.sqlVerify the restore worked:
bashmysql example_db -e "SELECT COUNT(*) FROM users;"Restart the application (it may have cached schema info)
Do NOT re-run migrations — the old code cannot understand the new schema
If you rolled back code but need to undo a migration:
Use the migration tool's rollback command:
hkm cli migrate:rollback
# Or rollback specific steps
hkm cli migrate:rollback --steps=2Never:
- Manually edit migration files after they've been applied
- Delete migration files from disk (they're immutable records)
- Run migrations in a partial or half-state (migrations should be atomic)
Post-Rollback
After rolling back:
- Check monitoring — error rate should return to baseline
- Gather logs — save the error logs for review
- Notify stakeholders — let the team know the rollback is complete
- Schedule a postmortem — understand what happened and how to prevent it
- Fix the bug on a branch and re-test before re-deploying
Deployment Windows
High-Traffic Applications
Schedule migrations during low-traffic windows:
# E.g., 2 AM on Tuesday
0 2 * * 2 deploy.shFor truly global applications with no low-traffic window, deploy during business hours and use the expand-contract pattern to minimize blocking time.
Schema Changes on Large Tables
Test the migration time on a copy of production data:
# Clone production database
mysqldump production_db > prod_clone.sql
mysql staging_db < prod_clone.sql
# Run the migration and measure time
time hkm cli migrate:runIf it takes > 30 seconds, consider batching or a background job approach instead.
Monitoring During & After Deployment
Real-Time Monitoring
Keep a terminal open watching the error log:
tail -f var/logs/errors.logAnd monitor request latency from your observability tool (DataDog, New Relic, etc.).
Key Signals
- Request latency (p50, p95, p99) — should not jump
- Error rate (4xx, 5xx) — should stay baseline
- Database connections — should not max out
- Memory usage — especially under OpenSwoole (workers should not grow monotonically)
- Cache hit rate — if you cleared cache, it will be low for a few minutes
Alerting
Configure alerts for:
error_rate > 1% for 5 minutes → page on-call engineer
latency_p95 > baseline + 100ms for 10 minutes → notify Slack
db_connection_pool_used > 90% → notify immediatelyDeployment Runbook Template
Keep a runbook for your application:
# Deployment Runbook
## Pre-Deployment (run on dev machine)
- [ ] `git pull origin main`
- [ ] `phpunit --testsuite=Feature` (all tests pass)
- [ ] `phpstan` (type checking clean)
- [ ] Database backup created: `mysqldump ... > backup.sql`
## Deploy to Production
1. SSH to production:
```bash
ssh deploy@prod.internal
cd /var/www/appUpdate code:
bashgit fetch origin git checkout main git pullInstall dependencies:
bashcomposer install --no-dev --optimize-autoloaderRun migrations (if any):
bashhkm cli migrate:run --pretend # preview first hkm cli migrate:runClear cache:
bashrm -rf var/cache/manifests/Restart:
bashsystemctl reload php8.4-fpm # or systemctl restart appVerify:
bashcurl https://example.com/health
Rollback (if needed)
git revert HEAD
git push origin main
rm -rf var/cache/manifests/
systemctl reload php8.4-fpmMonitor error rate for 5 minutes.
## Health Checks & Smoke Tests
After every deployment, verify:
```bash
#!/bin/bash
set -e
echo "Checking health endpoint..."
curl -f https://example.com/health || exit 1
echo "Checking API endpoints..."
curl -f https://example.com/api/me -H "Authorization: Bearer $TOKEN" || exit 1
echo "Checking database..."
curl -f https://example.com/api/invoices -H "Authorization: Bearer $TOKEN" || exit 1
echo "Deployment verified ✓"Run this immediately after deploy and add it to your CI/CD pipeline.
Common Pitfalls
Do not deploy schema changes and code that depends on them simultaneously
If schema migration fails partway through, the code still tries to use the old structure and crashes.
Correct: Deploy schema first, verify it worked, then deploy code that uses it.
Do not clear application cache without understanding the cost
// ✗ This will spike database load as all cached queries re-run
$cache->flush();
// ✓ This is more targeted and graceful
$cache->deletePattern('invoice:*'); // Only clear invoicesDo not trust an auto-rollback
Automation is useful, but the decision to rollback is human and should be quick, not automatic.
Instead: Alert immediately, let the on-call engineer decide in the first 5 minutes.
Do not skip testing migrations on staging
A migration that works on 100 rows might deadlock on a 100M-row table.